Compressors
are integral part of plants and consumes lot of
electricity. Efficient process Controls saves electricity.
TEMPERATURE
/ TIME Based controls is the principle of operation.
UN2000 is used in this method. The instrument is
designed for single or double stage compressors.
The antifridge and capacity control are important
temperature points. Compressor is switched ON &
OFF considering these points. This leads to optimum
use of compressor inturn saving in electricity bill.
Also DELAY TIME is introduced to avoid frequent
ON/OFF. Once the compressor gets off & if temperature
increases above set point it can get ON only after
the DELAY TIME. The delay time is also programmable.
THE TIME & TEMPERATURE MONITORING AND CONTROL
LEADS TO OPTIMUM USE OF COMPRESSORS.